CORRIDOR STUDIES: SR169 Connector to FAIN ROAD and Chino Valley Extension

The Central Yavapai Metropolitan Planning Organization (CYMPO) adopted the Metropolitan Transportation Plan (2030 Plan) in December of 2006. Within this long range plan, potential corridors were identified for future study. At the January 2007 meeting, the CYMPO Executive Board directed a technical group to identify and prioritize potential corridor studies. The Corridor Studies Working Group convened and the coutcome was that of two corridors settling in the top tier.
The SR169 Connector to Fain Road and the Chino Valley Extension Corridor Studies are too large to place on our Web Site. Please click "here" to order a CD of the Studies.
The Board approved these two corridors to be studied concurrently. These studies should assist CYMPO with information that may lead to, but not be limited to, the study of a future alignment. The studies are to be conducted at a "planning level" as a precursor to possible design concept reports to be conducted later. |