| HOME | PRODUCTS & RESOURCES | COMMENT PERIOD | CALENDAR | FAQs | NEWS | ABOUT US | CONTACT CYMPO
Corridor Studies
Corridor Studies


 
 

CORRODOR STUDIES

CORRIDOR STUDIES:
SR169 Connector to FAIN ROAD and Chino Valley Extension


June, 2008 Update:

The proposed SR 169 Fain Road Connector and the Chino Valley Extension will be vital transportation corridors for the quad-city area. These connectors in conjunction with the Great Western Extension from SR89A, are planned to be a part of a future road system connecting I-17 to I-40.

 

The Central Yavapai Metropolitan Planning Organization (CYMPO) has hired Civiltec Engineering and HDR to study these two proposed routes and prepare a planning level document describing feasible one-half mile wide corridors.

 

The study commenced in March, 2008, and is schedule to be completed in early 2009.

 

Property owners potentially affected by the corridors will be contacted by the consultant to explain the process and project details along with two general public meetings to explain the corridors and obtain public comments. The date and location of these two meetings will be announced at a later time on this web site along with announcements in the public news media.

 

Progress meetings with public agencies and the consultant are held the second Thursday, each month, at the Yavapai County Public Works office, 1100 Commerce, Prescott, AZ, with a general public meeting at 2:30 PM at the same location.

 

Questions and other comments may be directed to:

 

Richard Straub
Civiltec Engineering
2050 North Willow Creek Road
Prescott, AZ 86301
(928) 771-2376
Email: rstraub@civiltec.com


As the study progresses, additional information will be placed on this website and in other news media.

 

MEETING SUMMARIES

MAPS

2008 MEETING SCHEDULE

REQUEST FOR QUALIFICATIONS (RFQ)

PROJECT SCOPE

JULY 23, 2008 CORRIDOR STUDIES PUBLIC OPEN HOUSE

 

 

 

 


HOME
| PRODUCTS & RESOURCES | COMMENT PERIOD | FAQs | NEWS | ABOUT US | CONTACT CYMPO

Copyright 2009 CYMPO